Friday, 19 November 2010

Filming Day For Preliminary Task

Today we filmed our storyboard we prepared in the previous lesson. The initial storyboard was based on a burglary in the college with a security guard protecting what the robber wanted. We stuck to the basic story line but changed the props, costumes, and camera shots/angles. We did this because we found it easier to capture the full essence of the scene. We feel we have created a successful scene that links in with the task we prepared, we kept continuity throughout the whole short film, this helped the rhythm and the flow of one scene to the other. However trying to link the scenes together and keep everything the same as the previous shot proved fairly difficult but we managed to overcome the problem with some thought and discussion. 
We enjoyed the task we carried out, as it involved imagination and creativity throughout. It was also one of the first practical pieces we have done so far in media, and a change is always nice. We learnt the basic skills we need to construct and develop our children's opening sequence.

No comments:

Post a Comment

 
© 2009 12U2-57 CHILDRENS FILM 2010/11. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz